31 Jul KiwiRail and EUROFLO® HDPE Pipe
Find all case studies and testimonials relating to KiwiRail and EUROFLO® HDPE Pipe here...
OUR HELP DESK: 0800 99 77 33
Find all case studies and testimonials relating to KiwiRail and EUROFLO® HDPE Pipe here...
Fallout from flooding has caused issues for multiple regions around New Zealand and damaged roading infrastructure is often one of the biggest headaches....
EUROFLO® slotted pipe onboard for KiwiRail's Papakura to Pukekohe Electrification Project A significant project is currently underway to extend electrification of Auckland’s metro rail network between Papakura and Pukekohe — and EUROFLO® slotted pipe has been selected for the project drainage alongside the railway track. The ultimate...
An ambitious project being led by the Carterton District Council (CDC) is improving the treatment of the district’s urban wastewater — and the use of strong, large diameter 800mm EUROFLO® pipes is ensuring the benefits will last for decades to come.“Carterton District Council is upgrading...
MAINTAINING NATURAL STREAM FLOWS IN INSTREAM STRUCTURES FOR GOOD FISH PASSAGE Fish passage guidelines look complex but this P&F Global white paper outlines the simple concepts you need to follow to design instream structures that comply with regulations. To design an instream structure that complies with regulatory...
HOW TO MANAGE STORMWATER DRAINAGE ON A SLOPE New Zealand’s landscape is dominated by hills, gullies and mountain ranges, which is why developing stormwater drainage solutions for sloping land is a common challenge. Land on an incline is easily eroded by heavy rainfall and fast-flowing stormwater, but...
When it came time to upgrade the Kelso Grove stormwater pipe in the Wellington region, the main challenge facing the engineers was designing a drainage solution that would work for the steep gully slope. The pipe they selected needed to be suitable for gravity drainage and...
After a massive storm caused flooding and damage in Northland, EUROFLO® pipe was chosen as part of the rebuild solution. The storm in July 2020 was classed as a ‘one-in-500-year’ rain event — with 250mm rainfall recorded in some places in less than 24 hours —...
Extra strong EUROFLO® pipe has formed part of the solution in a roading project designed to reduce the flooding risk on a section of State Highway 6 (SH6) in the South Island. Fulton Hogan had the contract for this Waka Kotahi/NZ Transport Agency project and chose...
Development of the Ngawha Innovation & Enterprise Park in Northland, near Kaikohe, is underway and the large-scale project will involve the installation of close to 10km of EUROFLO® pipe to manage stormwater for one of the main sites....